Balancing Urban Development and Water Conservation
 

Parking Lots

We have the equipment, crew and most importantly, the knowledge and expertise to get things done right.

Our crews manage all aspects of construction: tearouts, excavation, basing, grading, curbing and paving. Our paving consultants will determine what makes the most sense for your project after understanding your objectives and will provide you with sensible options. And the installation crews, with years of experience, will impress you with their professionalism and abilities. Call us today to discuss your project!

 

 

 

 

project example

Sunset Cemetery

6 acres of roadway reconstruction

WORK: Reclaiming, milling, concrete stormwater pipe and catch basin repair, grading and asphalt

The cemetery had been spending money every year on costly spot repairs.  We put together a pavement rehabilitation schedule that provided a finished look to the property with significant cost-savings.


project example

Beltmann Group

5 acre parking lot reconstruction

WORK: Reclaiming, milling, geotextiles, curb and gutter repair, concrete truck pads, irrigation repair, asphalt and striping

Their business operates 24 hours a day, 7 days and week; therefore, it was important for our pavement reconstruction work to cause the least amount of disruption.  We developed a plan to phase the work around the site’s busiest times and areas.


Rethinking the Parking Lot

Low-Impact Development and Parking Lots

As a company that designs and installs both paving and ecological landscaping projects, we make use of conventional methods and, whenever possible, alternative techniques that mitigate stormwater runoff.  We have a passion for protecting one of our greatest resources, water, and thoughtful construction is a big part of this goal.

 

project example

Parkway Place Townhomes

21 townhome complex

WORK: Design, reclaiming, excavating, grading, curbing, asphalt, rain gardens, bioswale, pre-treatment forebays, permeable pavers and native plantings

The association was initially planning on simply repaving their roadways and driveways, but then decided it was the best time to consider other, more earth-friendly, options.  Now the property is much greener - both visually, with thousands of new plants, and environmentally. They have created a community gathering space while simultaneously saving thousands of dollars annually on their city stormwater fees.

See our work featured in Minnesota Community Living Magazine


project example

Minnesota Association of Professional Employees

Office building

WORK: Design, reclaiming, excavating, grading, concrete stormwater planters, asphalt, and native plantings

Altering the grades of the parking lot for stormwater treatment provides a unique look to what had been another big, expansive lot of asphalt. These four planters are positioned along the center of the lot to receive all the parking lot runoff. The water then filters through well-draining soils and native plants before overflowing into a suspended draintile that is connected to the city catch basin.

Winner of the 2016 City of Shoreview Green Community Award

SaveSave

SaveSave

SaveSave

Contact us for a consultation
 



I have already recommended you! Our consultant, Shelly, was extremely knowledgeable. She explained (the process) in technical detail. She is the reason I chose Earth Wizards over the other 5 bidders. Installation crew was terrific and exceeded my expectations.

- Don P.
XML Sitemap